3 Commissioning
3.8 Commissioning of the "Table positioning" technology application
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
Commissioning steps
Below find a description of the commissioning steps of the "Table positioning" application shown in
illustration [3-2]
.
Please observe the sequence of the steps in the following chapters and follow them through
carefully. This will help you to commission your inverter quickly and as safely as possible:
Prepare inverter for commissioning
( 68)
Creating an »Engineer« project & going online
( 69)
Parameterising the motor control
( 70)
Parameterise application
( 71)
Save parameter settings safe against mains failure
( 79)
Enable inverter and test application
( 79)