Lenze · 8400 HighLine · Reference manual · DMS 12.0 EN · 06/2017 · TD23 97
3 Commissioning
3.10 PC manual control
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
How to carry out positioning:
1. Select the profile to be executed (1 ... 15) in the Profile number list field.
2. If the inverter is still inhibited, enable the inverter via the Enable controller button.
• Please observe that the inverter will not be enabled if other sources of controller inhibit
(e.g. RFR terminal) are active.
If the inverter is in the "OperationEnabled" device status:
3. Press the Run POS button to start positioning.
•The Stop POS serves to stop active positioning at any time.