EasyManuals Logo

Manitowoc GROVE GMK4090 User Manual

Manitowoc GROVE GMK4090
994 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #194 background imageLoading...
Page #194 background image
Driving
5.1 Before driving
5 - 2 3 302 736 en Operating manual
GMK4090
xx.xx.xxxx
2. When the main boom is resting on a dolly
– All telescopic sections must be locked together.
– The slewing gear is switched off;
à p. 11 - 118.
– The boom floating position must be switched on;
à p. 6 - 13.
– The slewing gear freewheel must be switched on;
à p. 6 - 12.
– The boom pre-tensioning may be switched on;
à p. 6 - 14.
– The houselock may be switched off;
à p. 11 - 16.
– The superstructure must be unlocked;
à p. 11 - 14.
3. On the outriggers
– All outrigger beams must be fully retracted and secured to prevent
extension;
à p. 12 - 46.
– The outrigger pads are in the driving position;
à p. 12 - 53.
4. – All mirrors for crane operation are folded in/removed;
à p. 12 - 153.
– All spotlights are switched off and swivelled (if possible) in such a way
that no other drivers will be blinded by reflection;
à p. 11 - 128.
– The lighting on the outrigger must be switched off;
à p. 12 - 45.
5. Anemometer, air traffic control light and camera system must be
removed:
à Anemometer and air traffic control light, p. 12 - 147,
à Camera on main boom, p. 12 - 154.

Table of Contents

Other manuals for Manitowoc GROVE GMK4090

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc GROVE GMK4090 and is the answer not in the manual?

Manitowoc GROVE GMK4090 Specifications

General IconGeneral
BrandManitowoc
ModelGROVE GMK4090
CategoryConstruction Equipment
LanguageEnglish

Related product manuals