EasyManua.ls Logo

Manitowoc GROVE GMK4090 - Page 702

Manitowoc GROVE GMK4090
994 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Crane operation
11.9 Heating and air-conditioning system
11 - 154 3 302 736 en Operating manual
GMK4090
xx.xx.xxxx
Setting the tem-
perature
Select the symbol (1).
Set the desired temperature – symbol (2).
Change and confirm the respective values
using the control units (3) or (4).
Setting the heat-
ing start/heating
duration
Select a weekday – symbol (1).
Set the starting time for the heating – sym-
bol (3). You can set up to three starting
times.
Set the desired heating duration –
symbol (4). You can set a maximum heating
duration of 2 hours.
Set the desired temperature – symbol (2).
Change and confirm the respective values
using the controls (5) or (6).

Table of Contents

Other manuals for Manitowoc GROVE GMK4090

Related product manuals