EasyManua.ls Logo

Manitowoc GROVE GMK4090 - Page 837

Manitowoc GROVE GMK4090
994 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rigging work
12.10 Rigging work on the main boom
Operating manual 3 302 736 en 12 - 133
GMK4090
xx.xx.xxxx
Rigging the hoist rope
The rigging aid is connected to the hoist rope.
When rigging
Guide the rope (1) over the main boom
and over the upper head sheave.
Slowly unreel the hoist rope.
Use the rope (1) to keep the hoist rope ten-
sioned so that no slack rope occurs.
When unrigging
Slowly reel in the hoist rope.
Use the rope (1) to keep the hoist rope ten-
sioned so that no slack rope occurs.
Undoing the connection
Remove the rope (4).
Disconnect part (2) and (3) of the connector
and remove the hoist rope (1).
Store the rigging aid so that it is safe for
transport, under the passenger's seat if
possible.

Table of Contents

Other manuals for Manitowoc GROVE GMK4090

Related product manuals