Rigging work
12.10 Rigging work on the main boom
Operating manual 3 302 736 en 12 - 133
GMK4090
xx.xx.xxxx
Rigging the hoist rope
The rigging aid is connected to the hoist rope.
– When rigging
• Guide the rope (1) over the main boom
and over the upper head sheave.
• Slowly unreel the hoist rope.
• Use the rope (1) to keep the hoist rope ten-
sioned so that no slack rope occurs.
– When unrigging
• Slowly reel in the hoist rope.
• Use the rope (1) to keep the hoist rope ten-
sioned so that no slack rope occurs.
Undoing the connection
• Remove the rope (4).
• Disconnect part (2) and (3) of the connector
and remove the hoist rope (1).
• Store the rigging aid so that it is safe for
transport, under the passenger's seat if
possible.