Rigging work
12.10 Rigging work on the main boom
12 - 134 3 302 736 en Operating manual
GMK4090
xx.xx.xxxx
12.10.7 Possible reevings on the main boom
Possible reevings on lattice extensions and the auxiliary single-sheave
boom top;
à Lattice extension operating manual.
H
The maximum lifting capacity is specified in the supplied Lifting capacity
table
.
With 6 head
sheaves
If 7 head sheaves are provided;
à p. 12 - 137.
7-sheave hook block
Reeving
A 12-fall