6-1
ET 200S Distributed I/O System
EWA-4NEB 780602402-12
Commissioning and Diagnostics
Chapter overview
Chapter Description Page
6.1 Commissioning and diagnostics on PROFIBUS DP 6-1
6.2 Commissioning and diagnostics on PROFINET IO 6-57
Running tests
Note
You must make sure that your setup is safe. A complete function test and the
relevant safety tests must be conducted before final commissioning of a setup.
The tests must also include possible predictable errors. This will prevent danger to
persons or the setup during operation.
6.1 Commissioning and diagnostics on PROFIBUS DP
Chapter overview
Chapter Description Page
6.1.1 Configuring the ET 200S on PROFIBUS DP 6-2
6.1.2 Commissioning and startup of the ET 200S on PROFIBUS DP 6-10
6.1.3 Diagnostics with LED display 6-12
6.1.4 Diagnostic messages of the electronic modules 6-22
6.1.5 Evaluating the interrupts of the ET 200S 6-23
6.1.6 Diagnostics using STEP 5 and STEP 7 6-25
6