Power–On and Power–Up
5.1 Preparing for commissioning
5.1.1 Checklist
The following checklist will help you to commissioning the supplied components
without undue problems and ensure high availability on your product:
S When handling the components, all ESD measures are observed.
S All screws are tightened with their prescribed torque.
S All connectors are plugged correctly and locked/screwed.
S All components are grounded and connected to shields.
S The load capacity of the central power supply is taken into account.
Additional points should be observed depending on the drive system used. For
detailed information, please refer to:
S SINAMICS S120
Commissioning Manual
Section: Prerequisites for commissioning
S SIMODRIVE 611 universal
/FBU/ Description of Functions SIMODRIVE 611 universal
Section: General commissioning information
All components are dimensioned for defined mechanical, climatic and electrical
environmental conditions. No limit value may be exceeded, neither during oper-
ation, nor during transportation.
In particular, the following must be observed:
S Power supply conditions
S Pollution burden
S Function–impairing gases
S Ambient environmental conditions
S Storage/transport
S Shock stressing
S Vibration stressing
S Ambient temperature