5.1 Preparing for commissioning
5-108
© Siemens AG 2007 All Rights Reserved
SINUMERIK 840Di sl Manual (HBIsl) – 01/2007 Edition
5.1.2 Recommended sequence for first commissioning
The individual steps for first commissioning are listed below in the recom-
mended order.
1. The whole plant is mechanically and electrically connected and tested for
errors acc. to the checklist (see above).
SINUMERIK 840Di sl
SINAMICS S120 or SIMODRIVE 611 universal inverter system
Motors
SIMATIC S7 I/O components
HMI user interfaces
2. The order numbers (MLFB) of the SIMODRIVE 611 universal drives and
SIMATIC S7–I/O components should be available.
When creating the SIMATIC S7 project, they are used to check whether the
component chosen from the hardware catalog by ”HW Config” corresponds
to the component used on the plant.
3. Configure the SINUMERIK 840Di sl completely on first booting
(Section 5.2, Page 5-109)
4. Take the PLC default program supplied as the commissioning file for the
PLC (basic PLC program, PLC user program and configuration) or create
your own SIMATIC S7 project and load it into the PLC
(Section 8, Page 8-175)
5. Prepare the drives on the PROFIBUS DP for communication:
SINAMICS S120 (Section 9, Page 9-241)
SIMODRIVE 611 universal (Section 10, Page 10-275)
6. Perform commissioning of the NC (channels, axes and spindles, etc. (Sec-
tion 11.5, Page 11-310))
7. Set up the alarm texts (Section 12, Page 12-413)
8. Perform the commissioning of the drives:
SINAMICS S120 (Section 9, Page 9-241)
SIMODRIVE 611 universal (Section 10, Page 10-275)
9. Carry out a dry run for all axes and the spindle.
(Section 18, Page 13-421)
10. Perform the optimization of the drives:
SINAMICS S120: STARTER
SIMODRIVE 611 universal: HMI Advanced (Section 14, Page 14-427)
and/or SimoCom U
11. Carry out a user data backup (series startup file)
(Section 15, Page 15-459)
12. Optional: Make a complete data backup (partition and/or hard disk image):
References
/IAM2/ CNC Commissioning Part 5
Section: IM8
4 Save and restore data