6.8 Load configuration into PG (PLC --> STEP 7)
6-160
© Siemens AG 2007 All Rights Reserved
SINUMERIK 840Di sl Manual (HBIsl) -- 01/2007 Edition
6.8 Load configuration into PG (PLC --> STEP 7)
The configuration of a SINUMERIK 840Di sl PLC must be loaded onto an exter-
nal computer (STEP 7 PG/PC) using an Ethernet connection.
The following conditions must be fulfilled:
S The c omputer can c ommunicate via Ethernet or an Ethernet connection has
been established
S The PG/PC is connected to the Ethernet interface 1 (company network) of
the SINUMERIK 840Di sl PCU. (See Section 7.1.1, Page 7-161)
S The IP address of the Ethernet interface 1 (company network) of the
SINUMERIK 840Di sl PCU is known. (See Section 7.1.2, Page 7-161)
Perform the following steps to load the configuration from the target system:
1. Start STEP 7 on the external computer (PG/PC).
2. Create a new STEP 7 project to which the configuration shall be loaded.
3. In STEP 7, select the following menu options for the project: Target system >
Load station into PG
Since the communication parameters have not yet been communicated to
STEP 7, the node address selection dialog is displayed. Enter the following
data:
Dialog: “Select node address”
Rack: 0
Slot: 2
Target station: Local
IP address: <IP addr. of PCU Ethernet interface 1>
Note
Press the ”Return” key to confirm the entry of the
IP address
OK
After entering all relevant data, press OK to confirm the dialog.
The configuration is now uploaded from the controller into the project.
J
Requirements
Implementation
Dialog
6PLCComm