Troubleshooting
Troubleshooting with Error Messages
206 TimeHub 5500 TL1 Reference Guide 097-55501-02 Issue 7 – January, 2005
"S0-PWRA:CL,SNPWRA,NSA,03-13, 11:45:14:\" ENDED Power Supply A
failed \""
The following is an example of power loss on power terminal B on expansion
shelf 1:
SNDKCAQO05050501 03-03-13 11:45:20
** 0346 REPT ALM EQPT
"S1-PWRB:MJ,EXPWRA,NSA,03-13, 11:45:20:\"Power Supply B in
expansion failed\""
The following is an example of power being re-supplied to power terminal B on
expansion shelf 1:
SNDKCAQO05050501 03-03-13 11:45:25
A 0382 REPT ALM EQPT
"S1-PWRB:CL,EXPWRA,NSA,03-13, 11:45:25:\" ENDED Power Supply B in
expansion failed \""
Expansion Link Events
If the Management card contains firmware version 4328D or later versions, all
Expansion link related events use the following AIDs:
LINK1 – refers to the Expansion Shelf link 1 cable.
LINK2 – refers to the Expansion Shelf link 2 cable.
Also, the embedded description of the event was changed to indicate the AID of the
expansion Clock card associated with the event:
ECC1 – refers to Expansion Controller card 1
ECC2 – refers to Expansion Controller card 2
The affected events are:
EXNC1L1
EXNC2L1
EXNC1L2
EXNC2L2
For example, an error in the expansion link 1 cable that is detected in Expansion
Controller card 2 would be reported as follows:
SNDKCAQO05050501 03-03-13 13:19:23