Ascotel IntelliGate 2025/2045/2065
Part 4 Installing terminals 827
Tab. 4.77: a/b interface on the Terminal Adapter
Installation
Note:
The S interface to which a PC Operator Console is connected must be
configured with mode "V2".
1. Switch off the PC.
2. Plug the S-bus cable into the S-bus socket on the Terminal Adapter.
Plug the other end of the cable into the telephone socket.
3. Connecting the model cable:
– Plug the 9-pin connector into the V.24 socket on the Terminal Adapter.
– Plug the 9-pin or 25-pin connector into the PC's COM port.
4. Plug the cable of the telephone set or a/b adapter into terminal socket T1 on
the Terminal Adapter. If both are being used at the same time, use the sup-
plied intermediate cable.
5. Connect the headset to the a/b adapter.
6. Connect the power cord.
7. Set the Terminal Adapter.
8. Install the PC Operator Console application.
9. Set up remote data transmission for PPP communication (see also the Appli-
cation Notes on the PC Operator Console CD).
For further information please refer to the Installation Instructions on the PC
Operator CD.
RJ11 socket Pin Designation Colour
1– –
2– –
3a red
4 b green
5– –
6– –
6
5
4
3
2
1
haz1159aaxxa0