Ascotel IntelliGate 2025/2045/2065
Part 6 Function check 871
3.1.3 Testing the external Auxiliary Terminal Power Supply
(ATPS)
1. This test requires that the 230 V PBX power supply is not looped via the ATPS
auxiliary power supply but connected to a separate socket outlet.
2. Set up a call. At least one terminal has to be connected to an AD2 interface
of an expansion card (not the mainboard).
3. Disconnect the ATPS auxiliary supply from the 230 V mains. (Do not discon-
nect the connecting cable from the ATPS to the PBX connector strip.)
4. The call connection should be interrupted. This proves that the expansion card
was being powered not by the internal power supply but by the ATPS auxiliary
supply.
3.2 Checking internal connections
Sampling test on the user-network interfaces on the corresponding expansion
cards and on the 2025 / 2045 mainboard.
Checkpoints:
• Ringing
• Call connection
• Caller's identity
3.3 Checking external connections
Tests the operation of the network interfaces on the 2025 / 2045 mainboard and
the expansion cards.
3.3.1 Outgoing routes
Tests the operation of the routes by dialling the configured route number without
the exchange access prefix.