44
IFS 125M User Manual Bruker Optik GmbH
Operation 5
5.2 Switching spectrometer on and off
The spectrometer is turned on and off by the main power switch located on mobile elec-
tronics unit.
i
After powering up the spectrometer, wait at least 30 minutes before running any
measurements. This allows the electronics and the laser to stabilize.
Main power switch Status What is to be done?
On Turn the main power switch in the ON
position.
Off Turn the main power switch in the
OFF position.
Table 5.1: Operating status