EasyManua.ls Logo

Comtech EF Data SLM-5650B - Installation

Comtech EF Data SLM-5650B
412 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
SLM-5650B Satellite Modem
Revision 2
Installation 2–2 MN-SLM-5650B
The equipment contains parts and assemblies sensitive to damage by Electrostatic
Discharge (ESD). Use ESD precautionary procedures when touching, removing, or
inserting PCBs.
Step Task
1
Keep all shipping materials for storage or reshipment.
2
Check the packing list to ensure the shipment is complete.
3
Inspect the equipment for any possible damage incurred during shipment.
Contact the carrier and Comtech EF Data immediately and submit a damage report if damage is evident to the
shipment.
4
Read the manual.
2.2 Installation
When installing the SLM-5650B into a rack enclosure (Figure 2-2):
PROPER GROUNDING PROTECTION IS REQUIRED. The equipment must be connected to
the protective earth connection at all times. It is therefore imperative that the unit is properly
grounded, using the ground stud provided on the unit rear panel, during installation,
configuration, and operation.
PROPER AIR VENTILATION IS REQUIRED. In a rack system where there is high heat
discharge, provide forced-air cooling with top- or bottom-mounted fans or blowers.
Make sure there is adequate clearance inside the enclosure, especially at the sides for
air ventilation.
Air temperature inside the rack enclosure should never exceed 50
°
C (122
°
F).
For information about custom rack enclosures, contact Comtech EF Data Customer
Support, or visit Comtech EF Data’s Web site (www.comtechefdata.com/support.asp).

Table of Contents

Related product manuals