EasyManua.ls Logo

Epson N6 Series - Page 222

Epson N6 Series
376 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance 4. Cable
210 N6 Rev.2
(4)
Apply the grease to the cables between the
two cable fixing plates.
Grease:
Krytox: Cable A and B
Standard model: 1g for each
Cleanroom model: 1.5g for each
Apply the grease to each cable evenly.
Grease application range
(5)
To face the two cable fixing plates, bend the
cable unit and pass it through the Joint #1.
End effector side : Plate A
Base side : Plate B
Base side
End
effector
side
When operating
the
Manipulator, make sure
not to
apply excessive force to the cables.
Plate A
Plate B
(6)
Move the Arm #1 approx. 90 degrees.
Be careful not to get the
cables caught in the
Arm #1
.
(7)
Install the cable fixing plate
B to the base.
Hexagon socket head cap bolts: 2-M4×8
Tightening torque: 4.0 ± 0.2 N·m
Be careful not to tighten the screws with the
cables get caught
on the plate.
NOTE
NOTE
NOTE
NOTE

Table of Contents

Related product manuals