Maintenance 4. Cable
N6 Rev.2 211
Install the cable fixing plate
A to Arm #1.
Hexagon socket head cap bolts: 2-M4×8
Tightening torque: 4.0 ± 0.2 N·m
not to tighten the screws with the
cables get caught on the plate.
Pass the cable unit to the Arm #1.
Do not pass the cables forcibly while the
connectors get caught.
Doing so may result
disconnection of the cables or breakage of
Pass the cables (connectors) through the hole
on the end of the Arm #1
Cables (connectors):
BAT_CN3, BAT_CN6
GS01,
LED_CN1
connectors to the board.
Cables (connectors):
BAT_CN3, BAT_CN6
LED_CN1