6.8 Testing
Perform the following tests on the Power+ SA unit.
6.8.1 Blackout Test
This test is designed to verify the operation of Power+ SA in the event of a blackout, when
no ac power is supplied to the UPS.
1. Turn all ac input to the system Off (turn Off ac input switches to both Bypass and
Rectifier).
2. Measure the phase-to-neutral voltage for each output phase. The measurements
should all be 230 V (or as specified).
6.8.2 Cold Start
This test is designed to verify the operation of the UPS after all input power (both mains and
battery) has been shut off and the UPS is powered up with battery only and no ac input.
1. Turn all ac and dc input to the system Off, so that there are no voltages at any of the
inputs to the UPS.
2. Turn On the switch to the dc input (from the batteries) only.
3. Wait approximately 2 minutes for Power+ SA to initialize (see Section 6.6, Power-up
(Initial Startup), starting on page 36).
4. Measure the phase-to-neutral voltage for each output phase. The measurements
should all be 230 V (or as specified).
5. Turn On the ac inputs to the system.
6.8.3 Test under Load
This test is designed to verify the operation of Power+ SA under load.
1. Connect the load.
2. Measure the ac input voltage during operation under load. Take the measurements
at the output terminals of Power+ SA (phase-to-phase between L1-L2, L2-L3, and
L3-L1 and phase-to-neutral at L1, L2, and L3). Phase-to-phase and phase-to neutral
voltage should be not less that 2% below no-load values.
3. Check and record the total system load (output current) and make sure that
Power+ SA is not overloaded with respect to system specifications.
4. Ascertain correct and orderly operation. Verify that Power+ SA is operating normally
and that no alarms or fault indications are present.