EasyManua.ls Logo

IRIS iChemVelocity

IRIS iChemVelocity
238 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
8 Maintenance & Service
301-7146 English Rev B 11/02/2011 Operators Manual NA 143
13. Re-install the strip loader in the instrument, and turn it to the lock
position.
14. To close and replace the Strip Provider Module, see Accessing the
Strip Conveyor Module.
15. Close the front and left side doors.
16. Turn the power on by pressing the green button located on the left
side of the chemistry system.
17. Click on the Go On line button. The system status will change to On
Line.
18. Let the system warm up for 10 minutes before resuming operation.

Table of Contents