AKD Installation | 10 Record of Document Revisions
10 Record of Document Revisions
Revision Remarks
-, 11/2009 Beta launch version
-, 12/2009 Digital I/O corrections, several updates
A, 03/2010 CAN termination connector "optional", data dynamic brake updated, resolver
signals renamed, CE certificate, X9 description updated, technical data com-
pleted
B, 06/2010 Several updates, typos, dimensions corrected, switch on/off timing diagrams
C, 07/2010 Switch on/off timing diagrams,typos, cover layout
D, 01/2011 Hardware Revison C, STO certified, voltage level digital inputs changed
E, 04/2011 Analog In/Out specification extended, single-/two phase mains supply
updated
F, 10/2011 PROFINET RT, Modbus TCP, several updates, cover layout updated
G, 03/2012 AKD PDMM added, 270 Vac mains supply restriction removed, part number
scheme extended, EnDat 2.2 @ X9, STOP chapter updated, dimension draw-
ings
H, 05/2012 AKD-T-IC added, I/O option card signals added , PDMM error codes updated
J, 08/2012 Smart Abs (Tamagawa) new, BiSS C new, X21 & X22 pinout updated
K, 11/2012 Feedback wiring diagrams updated, font size hint, fault tables updated, regen
fusing
L, 05/2013 Hiperface DSL Feedback new (from FW 1.9), fault tables updated, KCM mod-
ule added
192 Kollmorgen™ | May 2013