Measuring ICT Temperature (Temp)
13 - 6 V Series Operating Instructions
1. Connect the Camino temperature cable into the Camino cable bracket cable (as shown in 
FIGURE 13-6).
FIGURE 13-6 Connecting Camino Beside Monitor Cable and Camino Adapter Kit
2. Insert the Camino Adapter Kit Connection Cable into the VPS Temp connector beside the IBP 
connector (as shown in FIGURE 13-7). 
FIGURE 13-7 Camino Adapter Kit Cable Installed into VPS
3. For Camino operating instructions, including starting the Camino device, zeroing pressure 
transducers, and calibrating the bedside monitor, refer to the Advanced Monitoring CAM01 
Operating Manual.