EasyManua.ls Logo

Rohde & Schwarz SMBV100A - Page 166

Rohde & Schwarz SMBV100A
780 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Instrument Function
R&S
®
SMBV100A
149Operating Manual 1407.6062.32 ─ 08
Copy to ref
Defines the current curve as the reference curve.
A window opens in which the curve can be given a comment and a color.
First of all the desired color is highlighted in the top window. If this color has already been
assigned to a reference curve, this curve is overwritten. The command is entered in the
bottom "Comment" section. This comment then appears next to the highlighted color.
Up to 5 reference curves can be defined and displayed simultaneously in different colors
together with the current signal.
Each reference curve is available until it is deleted.
"Display area"
The comments entered for the defined reference curve are shown in
the display area next the assigned color. A maximum of five colors (and
reference curves) are available. If no reference curve is assigned to a
particular color, the comment <empty> is displayed.
"Comment"
Enters a comment for the current curve which is to be defined as the
reference curve. This comment then appears next to the highlighted
color in the display area.
"Delete"
Deletes the curve highlighted in the display area.
Curves which are no longer required can be deleted to reduce the num-
ber of reference curves displayed simultaneously.
"Assign"
Defines the current curve as the reference curve.
The new reference curve is shown together with the entered comment
next to the selected color in the display area.
SCPI command:
n.a.
Graphical Display - Graphics

Table of Contents

Other manuals for Rohde & Schwarz SMBV100A

Related product manuals