EasyManua.ls Logo

Schweitzer Engineering Laboratories SEL-311C - Data-Link Operation

Schweitzer Engineering Laboratories SEL-311C
748 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
I.4
SEL-311C Relay Instruction Manual Date Code 20060320
DNP Communications
Data-Link Operation
Data-Link Operation
It is necessary to make two important decisions about the data-link layer
operation. One is how to handle data-link confirmation, the other is how to
handle data-link access. If a highly reliable communications link exists, the
data-link access can be disabled altogether, which significantly reduces
communications overhead. Otherwise, it is necessary to enable confirmation
and determine how many retries to allow and what the data-link time-out
should be. The noisier the communications channel, the more likely a message
will be corrupted. Thus, the number of retries should be set higher on noisy
channels. Set the data-link time-out long enough to allow for the worst-case
response of the master plus transmission time. When the SEL-311C decides to
transmit on the DNP link, it has to wait if the physical connection is in use.
The SEL-311C monitors physical connections by using CTS input (treated as
a Data Carrier Detect) and monitoring character receipt. Once the physical
link goes idle, as indicated by CTS being deasserted and no characters being
received, the SEL-311C will wait a configurable amount of time before
beginning a transmission. This hold-off time will be a random value between
the MINDLY and MAXDLY setting values. The hold-off time is random,
which prevents multiple devices waiting to communicate on the network from
continually colliding.

Table of Contents

Related product manuals