EasyManuals Logo

Voltech AT5600 User Manual

Voltech AT5600
438 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #309 background imageLoading...
Page #309 background image
C H A P T E R 1 4 - A T E D I T OR
AT5600 User Manual 98-119 issue 14 Page 309
14.5 .12.3 Test Group ing
Tests can be programmed in any order you wish, and the results for each individual test
will be independent of where they are in the program.
However, the AT5600 has 6 different power sources, and to get the best speed
execution time we recommend that tests are grouped using the following table.
This minimizes change over time between the different sources.
Please note that the table and Best Speed Groupingcolumn does not indicate any
overall ORDER for the tests, just the best grouping.
Tests in the same group can be run in any order, and the groups can be run in any order
(e.g. most customers always start with R to check windings)
For example
LS RLP Z HPAC
would execute faster than
LS HPAC RLP Z
as HPAC is in a different grouping from the other 3
Or
R LS RLS MAGI VOC
would execute faster than
R LS MAGI RLS VOC
as MAGI and VOC are in the same group.
Test
Test Description
Best Speed Grouping
ANGL
Impedance Phase Angle
A
D
Dissipation Factor
A
L2
Inductance Match
A
LL
Leakage Inductance
A
LP
Parallel Inductance
A
LS
Series Inductance
A
QL
Quality Factor
A
RLP
Equivalent Parallel Resistance
A
RLS
Equivalent Series Resistance
A
TRL
Turns Ratio By Inductance
A
Z
Impedance
A
LPB
Parallel Inductance with Bias
B
LSB
Series Inductance with Bias
B
ZB
Impedance with bias
B
LVOC
Low Voltage Open Circuit
C
PHAS
Interwinding Phase Angle
C
TR
Turns Ratio
C

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Voltech AT5600 and is the answer not in the manual?

Voltech AT5600 Specifications

General IconGeneral
BrandVoltech
ModelAT5600
CategoryTest Equipment
LanguageEnglish

Related product manuals