C H A P T E R 8 – F R O N T P A N E L O P E R A T I O N
AT5600 User Manual 98-119 issue 14 Page 182
Run Screen
Once a program is loaded into the AT5600, connect the transformer to the fixture
and press the Run button to begin testing the transformer. When testing is
complete, you will see the following display:
• RESULTS show the results of the test
• COMPENSATE used to perform an Open, Short or Load
Compensation again, if you wish
• SN/BATCH/ OP used to change the serial number of the part under
test, Batch Number, and Operator Number. The soft-key is enabled only if
the option(s) are selected in the test program
• FINISH return to the top-level screen