Recommissioning
Instruction handbook b maXX 5000
Document No.: 5.09021.16 Baumüller Nürnberg GmbH
292
of 328
12.6
12.6 Recommissioning
Execute commissioning as with a new device, see
ZMou
ntingas from page 107, ZInstallationas from page 123.
NOTICE!
Recommissioning without forming of the capacitors.
From six months storage period on, the capa
citors are destroyed during commission-
ing, if they are not formed beforehand
m Reform the DC
link capacitors:
n by
supplying the device ready-to-operate for at least one hour with
supply voltage
n bu
t do not transmit a pulse enable during this time.
m Con
sider, that it is imperative, to connect the accordingly prescribed line commu-
tating choke for this forming procedure. Devices, where no line commutating choke
is nece
ssary can directly be supplied with mains voltage.
.

Table of Contents

Other manuals for Baumuller b maXX 5000

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Baumuller b maXX 5000 and is the answer not in the manual?

Baumuller b maXX 5000 Specifications

General IconGeneral
BrandBaumuller
Modelb maXX 5000
CategoryServo Drives
LanguageEnglish

Related product manuals