EasyManua.ls Logo

BERTHOLD TECHNOLOGIES Uni-Probe LB 490 - Dig. Output Test; Status Dig. Input

BERTHOLD TECHNOLOGIES Uni-Probe LB 490
730 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
38477BA2B
3 – 330 25.5.09
Menu Structure Volume 3
2.34 STATUS DIG. INPUT
DI 1, DI 2, DI 3
Check the status of the digital inputs.
Short a digital input to check its displayed status (open/shorted).
2.35 DIG. OUTPUT TEST
DO 1, DO 2, DO 3, DO 4
Change the relay status (open/shorted) and measure at the con-
necting terminal if the relay has switched correctly.

Table of Contents