1 689 989 000 2013-05-02| Robert Bosch GmbH
26 | EPS 200 | en
Contents English
1. Symbols used 27
1.1 In the documentation 27
1.1.1 Warning notices -
Structure and meaning 27
1.1.2 Symbols –
Designation and explanation 27
1.2 On the product 27
2. User information 27
2.1 Important notes 27
2.2 Safety instructions 27
2.3 Electromagnetic compatibility (EMC) 27
3. Product description 28
3.1 Use 28
3.2 Requirements 29
3.2.1 Hardware 29
3.2.2 Training 29
3.3 Delivery specification 29
3.4 Optional accessories 29
3.5 Description of unit 30
3.5.1 Front view 30
3.5.2 Rear view 30
3.5.3 Components for testing 30
3.5.4 Connector panel 30
3.5.5 PC connections 31
3.5.6 Flushing drain 31
3.5.7 Extraction controller for
internal extractor 31
3.5.8 Injection chamber, clamping ring,
O-ring 31
3.5.9 Connection adapter for
CRI/CRIN and DHK/UI 33
3.5.10 Hose lines 33
3.5.11 Adapter leads for CRI connection 34
3.5.12 Oil drain hose line 34
3.5.13 Sealing plug for leak test 34
3.5.14 Protective cover 34
3.6 Description of function 34
4. Setup 35
4.1 Transportation and installation 35
4.2 Installing the protective cover 36
4.3 Remove the transport protection 37
4.4 Electrical connection 38
4.4.1 EPS 200 / 200 V basic unit 38
4.4.2 EPS 200 / 400 V basic unit 38
4.5 Connecting the compressed air /
external extractor 38
4.6 Adding test oil 38
4.7 EPS 200 language settings 38
4.7.1 Language setting for
on-screen keyboard 38
4.7.2 Language setting for
EPS 200 system software 38
5. Operation 39
5.1 Turning on/off 39
5.1.1 Touchscreen with stylus 39
5.1.2 On-screen keyboard 39
5.2 Preparations for testing 39
5.3 Cleaning instructions for CRI/CRIN and
DHK/UI 39
5.4 Operation 40
5.4.1 Symbols and connection overview for
CRI/CRIN and DHK/UI tests 40
5.4.2 DHK/UI test sequence 40
5.4.3 CRI/CRIN test sequence 41
5.5 Topping up the test oil 42
5.6 Program description 42
5.7 Updating the software 42
5.8 Faults 42
6. Maintenance 43
6.1 Cleaning 43
6.2 Servicing 43
6.2.1 Service intervals 43
6.2.2 Replacing high-pressure hose 43
6.2.3 Checking hoses 43
6.2.4 Cleaning the jet chamber and
the ring light cover 43
6.2.5 Replacing the test oil 44
6.2.6 Replacing the intake filter
in the test oil tank 45
6.2.7 Replacing flowmeter pipe filter 46
6.2.8 Checking toothed belt 46
6.2.9 Replacing toothed belt 46
6.3 Spare and wearing parts 46
7. Decommissioning 47
7.1 Relocation 47
7.2 Scrapping 47
7.3 Disposal 47
8. Technical data 47
8.1 EPS 200 47
8.2 Noise emissions 47
8.3 Dimensions and weights 47