EasyManua.ls Logo

Ecolab EcoAdd Series

Ecolab EcoAdd Series
604 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6.3 Hydraulic Installation
Personnel:
n
Mechanic
n
Service personnel
n
Specialist
Protective equipment:
n
Chemical-resistant protective gloves
n
Protective eyewear
n
Safety shoes
1
2
3
4
D
P
S
Fig. 10: Installation diagram
1 Overflow valve
2 Pressure-retention valve
3 Optional: Multi-function valve (MFV)
4 Suction lance or Bottom suction valve
D Pressure valve
P Pump head
S Intake valve
Using a multi-function valve (MFV):
Dosing, pressure retention and overpressure valves (pos. 1 and pos. 2) can
be replaced by a multifunction valve (MFV) (pos. 3).
When using its essential to observe the corresponding instructions .
When using a dosing valve, dosing peaks < 1.2 mPa (12 bar) may occur.
This will cause the pump to display an error and stop.
Troubleshooting:
1. Check back-pressure!
2. Check all valves on the metering lines; it may be that a valve fitted in the metering
line is not opening correctly or may even be closed.
3. Check system pressure and reduce if necessary
.
Mounting and installation
47 417102276 Rev. 5-02.2020

Table of Contents

Related product manuals