EasyManua.ls Logo

Ecolab EcoAdd Series

Ecolab EcoAdd Series
604 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6.3.2.2 Hose connection with plug section and clamping section
A1
B1
1
2
3
4
5
6
Fig. 12: Pipe/hose connection with tapered part
1 Hose
2 Swivel nut
3 Clamp
4 Cone
5 O-Ring
6 Suction valve, pressure valve
A1 Pipe or Hose plugged on
B1 Valve connection: Target state after assembly
1. Cut hose (Pos. 1) straight.
2. Push the swivel nut (pos. 2) over the hose (pos. 1).
3. Push the clamping piece (pos. 3) over the hose (pos. 1).
4. Push the hose (pos. 1) onto the tapered part (pos. 4) up to the stop collar (detail A1).
5. Push the clamping piece (pos. 3) in the direction of the tapered part (pos. 4) until
resistance is noticeable.
6. Place an O-ring (pos. 5) in the groove of the suction or pressure valve (pos. 6).
7. T
ighten the union nut (2) (detail B1).
Mounting and installation
52417102276 Rev. 5-02.2020

Table of Contents

Related product manuals