Power supply
6.3.3.3 Installing the new hot-plug power supply unit
Ê Install the power supply unit as described in section "Installing a hot-plug
power supply unit" on page 98.
6.3.3.4 Concluding steps
Ê Connect the power cord to the new power supply unit and secure it with a
cable tie as described in section "Connecting the server to the mains" on
page 55.
Ê Only when replacing a power supply unit in a non-redundant configuration:
"Switching on the server" on page 57
Ê "Performing a fan test after replacing a defective fan" on page 89
6.3.4 Replacing the power distribution board
6.3.4.1 Preliminary steps
Ê "Locating the defective server" on page 43
Ê "Disabling BitLocker functionality" on page 63
Ê "Shutting down the server" on page 45
Ê "Disconnecting the server from the mains" on page 46
Ê "Getting access to the component" on page 47
Field Replaceable Unit
(FRU)
Hardware: 15 minutes
Tools: Phillips PH2 / (+) No. 2 screw driver