EasyManuals Logo

Fujitsu PRIMERGY RX100 S8 Upgrade And Maintenance Manual

Fujitsu PRIMERGY RX100 S8
296 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #99 background imageLoading...
Page #99 background image
RX100 S8
Upgrade and Maintenance Manual 99
Power supply
Figure 30: Installing the cable tie
Ê Push the cable tie into the corresponding hole until it clicks in.
6.3.1.4 Concluding steps
Ê "Connecting the server to the mains" on page 55
6.3.2 Removing a hot-plug power supply unit
I Note for servers using CMA (Cable Management Arm)
Regarding of removing power supply units, additional tasks are needed,
due to an interference between CMA stopper and the power supply units.
Ê Unlock the CMA stopper.
Ê Remove the CMA stopper with the mounted crossbar.
Ê Support the CMA stopper, the crossbar and the CMA including cables
with your right hand.
Customer Replaceable Unit
(CRU)
Hardware: 5 minutes
Tools: tool-less

Table of Contents

Other manuals for Fujitsu PRIMERGY RX100 S8

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fujitsu PRIMERGY RX100 S8 and is the answer not in the manual?

Fujitsu PRIMERGY RX100 S8 Specifications

General IconGeneral
BrandFujitsu
ModelPRIMERGY RX100 S8
CategoryServer
LanguageEnglish

Related product manuals