RX100 S8
Upgrade and Maintenance Manual 191
Expansion cards and backup units
Ê If the BBU status does not change after 8 hours, please try to initiate the
recalibration process manually using the ServerView RAID Manager.
I If this procedure still does not fix the BBU status, please contact your
local Fujitsu customer service partner.
9.5.2 Installing an FBU
9.5.2.1 Preliminary steps
Ê "Disabling SVOM boot watchdog functionality" on page 64
Ê "Shutting down the server" on page 45
Ê "Disconnecting the server from the mains" on page 46
Ê "Getting access to the component" on page 47
9.5.2.2 Installing TFM to the RAID controller (if applicable)
Figure 127: TFM kit
Upgrade and Repair Unit
(URU)
Hardware: 15 minutes
Tools: Phillips PH1 / (+) No. 1 screw driver (for installing TFM)
1 TFM 2 Screws