EasyManua.ls Logo

LS Industrial Systems XGT Series - Positioning Control

LS Industrial Systems XGT Series
369 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 9 Functions
9-17
9.2.3 Positioning Control
After executed by the start positioning operation command (Direct start, Indirect start,
Simultaneous start), positioning control from specified axis (the current stop position) to goal position (the
position to move).
(1) Control by Absolute method (Absolute coordinate)
(a) Positioning control from start position to goal position (the position assigned by positioning data). Positioning
control is carried out based on the position assigned (origin position) by homing.
(b) Transfer direction shall be determined by start position and goal position.
Start position < Goal position: forward direction positioning
Start position > Goal position: reverse direction positioning
[Example] Set the Incremental Coordinates as follow, Operate shortening positioning control.
Start position: 1000,
Goal position: 8000
The transfer amount to forward direction shall be 7000 (7000=8000-1000).
Setting of XG5000
Step
NO.
Coord. Control Method Pattern
Goal Position
[pls]
Operation Speed
[pls/s]
Accel NO.
Decel
NO.
M Code
Dwell
Time
1 ABS POS SIN END 8000 1000 No.1 No.1 0 100
Operation Pattern
Amount of movement = 7000
Dwell time = 100ms
Speed
Time
ON
Start
command
In
operation
In dwell
Positioning
complete
ON
ON
1000
ON

Table of Contents

Other manuals for LS Industrial Systems XGT Series

Related product manuals