3.18 EM1 / EM2 / EM3 Lift Connections
NOTE
Review the information in Section 3.14 before performing any lifting
procedure.
3.18.1 EM1 / EM2 / EM3 Vertical Lift Connections
Table 3-9 EM1 / EM2 / EM3 Vertical Lift Connections
EM1 / EM2 EM3
Connect sling to motor end of the
support beam using one 16 mm (5/8
in.) shackle in lifting hole.
Connect sling to motor end
of the support beam using a
25 mm (1 in.) shackle in lifting
hole.
3-26
© 2020 Mold-Masters (2007) Limited. All Rights Reserved.
SAFETY
E-Multi Controller User Manual