EasyManua.ls Logo

Mold-Masters E-Multi EM1 - EM1; EM2; EM3 Horizontal Lift Connections; Table 3-10 EM1; EM2; EM3 Horizontal Lift Connections

Mold-Masters E-Multi EM1
161 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3.18.2 EM1 / EM2 / EM3 Horizontal Lift Connections
NOTE
For best results use an adjustable two leg chain bridle.
Table 3-10 EM1 / EM2 / EM3 Horizontal Lift Connections
EM1 / EM2 EM3
Connect one sling (A) to motor end of
the support beam by feeding it through
the lifting hole, with sling on either side
of the motor.
Connect other sling (B) to barrel end
of the support beam using two 16 mm
(5/8 in.) shackles in the lifting holes.
NOTE: EM1 / EM2 units require
blocks or shipping brackets when set
down horizontally to prevent damage
to the linear actuator.
Connect one sling (A) to motor
end of the support beam by
feeding it through the lifting hole,
with sling on either side of the
motor.
Connect other sling (B) to barrel
end of the support beam using two
25 mm (1 in.) shackles in lifting
holes.
A
B
3-27
© 2020 Mold-Masters (2007) Limited. All Rights Reserved.
SAFETY
E-Multi Controller User Manual

Table of Contents

Related product manuals