EasyManua.ls Logo

RADIOMETER ABL90 FLEX - Rinse Process

RADIOMETER ABL90 FLEX
346 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. Wet section ABL90 FLEX reference manual
3-6
Rinse process
After a measurement is complete a rinse is performed. The rinse process is the
same, no matter what kind of measurement (patient measurement, QC and
calibration) is performed. The following table describes this rinse process.
Stage Description
1 After the measurement is complete the first part of the rinse is
performed with a mixture of solutions and air.
2. The next part of the rinse is performed with a mixture of solutions
and gas.
3. Thereafter the wet section is checked. The system is filled with gas
to equilibrate the measuring chambers.
4. The entire measuring path is filled with CAL 1 (rinse) solution. The
calibration status is reestablished and the device is now ready for a
new measurement.

Table of Contents

Related product manuals