EasyManua.ls Logo

SeaDoo GTX Series 2022 - Page 175

SeaDoo GTX Series 2022
269 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section 06 STEERING AND PROPULSION
Subsection 01 (STEERING)
11.2 Tighten the half-rings retaining screws to
specification.
TIGHTENING TORQUE
Half-rings retaining
screws
8Nm ± 1Nm
(71 lbf•in ±9lbfin)
12. Install the b
all joint on the end of the steering
cable.
12.1 The threaded portion of steering cable
inserted into ball joint should be within
9 mm ± 1 mm (.354 in ± .039 in).
A
smr2006-031-006_a
A. 9 mm ± 1 mm (.354 in ± .039 in)
12.2 Tighten jam nut to specification.
12.3 Position the steering cable ball joint to the
nozzle as per following illustration.
219
100893-028-023_a
1. Ball joint bolt
2. Ball joint
3. Was
her
TIGHTENING TORQUE
Ball joint jam nut
2.5 N•m ± 0.3 N•m
(22 lbf•in ±3lbfin)
Ball joint bolt
7Nm ± 1Nm
(62 lbf•in ±9lbfin)
The installation of the steering cable to the steer-
ing column is the reverse of the removal proce-
dure. However, pay attention to the following.
TIGHTENING TORQUE
Cable support retaining
screw
5.5 N•m ± 0.5 N•m
(49 lbf•in ±4lbfin)
Carry out
ADJ
USTING THE ALIGNMENT OF THE
STEERING
.Se
e procedure in this subsection.
The threaded portion of steering cable inserted
into the end fitting should be 9 mm ± 1 mm
(.354 in ± .039 in).
219100893-028-308_a
A. 9mm ± 1mm (
.354 in ± .039 in)
Install a ll removed parts using appropriate proce-
dure.
Adjusting the Steering Cable
1. Steering cable adjustment is required only if:
A steering cable end ball joint has been re-
placed or loosened/tightened.
Steerin
g cable adjustment nut has been loos-
ened/ti
ghtened.
Steering cable has been replaced.
Steering column or support has been re-
placed.
2. Lock the jet pump nozzle position b y installing
a 10 mm (3/8 in) rod through the trimming ring
as the following illustration.
160 219100963-017

Table of Contents

Related product manuals