EasyManua.ls Logo

Siemens HiPath 3000 Series - Planning Load for Hipath Systems

Siemens HiPath 3000 Series
1302 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
sysdat.fm
A31003-H3590-S100-7-7620, 06/2012
HiPath 3000/5000 V9, Service documentation
2-55
Nur für den internen Gebrauch System Data
Dynamic Configuration Rules
2.5.2.2 Planning Load for HiPath Systems
This section describes a dimensioning method for the various systems. In order to provide for
sufficient reserves to handle load fluctuations during operations, a so-called planning load is
defined the systems. This planning load consists of 70 % of the capacity available for call pro-
cessing (switching) transactions (see Figure below).
Figure 2-7 Planning Load for HiPath 3000/5000 Systems
The planning load values described here are taken into account in the following table as the
“maximum permissible points”.
Basic load
(e.g., polling)
Reserve for load fluctua-
tions
Planning load for call
processing
Absolute shares
70 (1-basic load)%
70 %
HiPath 3000
100 %
Relative shares
(w/o basic load)

Table of Contents

Related product manuals