Safety Integrated Basic Functions
10.2 General information
Drive functions
678 Function Manual, 11/2017, 6SL3097-4AB00-0BP5
Forced dormant error detection (test stop) can be automatically executed at POWER ON.
If the forced dormant error detection (test stop) as well as the test of the F-DO for the
CU310-2 are to be executed automatically, then set p9507.6 = 1. When testing the FD-O
of the CU310-2, you must parameterize p10042 and activate the test in p10046.
If the forced dormant error detection (test stop) of the F-DI and F-DO of the TM54F is to
be executed automatically, then set p10048 = 1.
If you have parameterized the forced dormant error detection (test stop) for POWER ON,
you can still initiate a forced dormant error detection (test stop) at any time through the
application.
If the automatically initiated function cannot be correctly completed as a result of a
problem (e.g. communication failure), then after the problem has been resolved, the
function is automatically restarted.
After the forced dormant error detection (test stop) has been successfully executed, the
converter goes into the "Ready" state.
Timer p9659 is automatically reset as a result of the forced dormant error detection (test
stop).
The automatic forced dormant error detection (test stop) for POWER ON does not
influence the Safety Integrated functions.

Table of Contents

Other manuals for Siemens SIROTEC

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Siemens SIROTEC and is the answer not in the manual?