EasyManua.ls Logo

Suzuki SFV650 - Page 109

Suzuki SFV650
573 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Engine General Information and Diagnosis: 1A-46
3 1) Turn the ignition switch OFF.
2) Connect the ECM coupler. Refer to “ECM Removal and
Installation in Section 1C (Page 1C-1)”.
3) Connect the special tool between the TP sensor and its
coupler.
4) Turn the ignition switch ON.
5) Measure the TP sensor output voltage between the P/W
wire terminal (+) and B/Br wire terminal (–) with turning
the throttle grip open and close.
Special tool
(C): 09900–28630 (TPS test wire harness)
: 09900–25008 (Multi-circuit tester set)
Tester knob indication
Voltage ( )
TP sensor output voltage
Throttle valve is closed: Approx. 1.1 V
Throttle valve is opened: Approx. 4.3 V
((+) terminal: P/W – (–) terminal: B/Br)
Is the voltage OK?
Replace the ECM with a
new one. Refer to “ECM
Removal and
Installation in Section
1C (Page 1C-1)”.
If check result is not
satisfactory, replace TP
sensor with a new one.
Refer to “Throttle Body
Disassembly and
Assembly in Section 1D
(Page 1D-11)”.
Step Action Yes No
ECMTPS
P/W
R
B/Br
(C)
I944H1110028-01

Table of Contents

Related product manuals