EasyManua.ls Logo

Suzuki SFV650 - Battery Removal and Installation

Suzuki SFV650
573 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1J-12 Charging System:
2) Measure the battery voltage using the multi-circuit
tester.
If the voltage reading is less than the 12 V (DC),
recharge the battery with a battery charger.
Recharging time
1.2 A for 5 to 10 hours or 5 A for 1 hour
CAUTION
!
Be careful not to permit the charging current
to exceed 5 A at any time.
3) After recharging, wait at least 30 minutes and then
measure the battery voltage using the multi-circuit
tester.
If the battery voltage is less than 12.5 V, recharge
the battery again.
If the battery voltage is still less than 12.5 V after
recharging, replace the battery with a new one.
4) Install the battery to the motorcycle. Refer to “Battery
Removal and Installation (Page 1J-12)”.
Battery Removal and Installation
B944H11A06009
Refer to “Electrical Components Location in Section 0A
(Page 0A-7)”.
Removal
1) Remove the seat. Refer to “Exterior Parts Removal
and Installation in Section 9D (Page 9D-4)”.
2) Remove the stay (1) and battery holder lid (2).
3) Disconnect the battery (–) lead wire (3).
4) Disconnect the battery (+) lead wire (4).
NOTE
Be sure to disconnect the battery (–) lead
wire (3) first, then disconnect the battery (+)
lead wire (4).
5) Remove the battery (5) from the motorcycle.
Installation
Install the battery in the reverse order of removal.
Pay attention to following points:
CAUTION
!
Never use anything except the specified
battery.
Tighten the battery lead wire mounting bolts securely.
Fix the battery holder lid (1) to the groove of battery
holder.
“A”: Charging period “B”: Stop charging
“A”
“B”
I649G11A0045-02
I944H11A0029-01
1
2
5
3
4
I944H11A0025-03
1
I944H11A0026-01

Table of Contents

Related product manuals