EasyManua.ls Logo

Suzuki SFV650 - Valve Clearance Inspection and Adjustment

Suzuki SFV650
573 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1D-43 Engine Mechanical:
Intake Pipe
Apply grease to the O-ring.
CAUTION
!
Use a new O-ring to prevent mixture air from
soaking through the joint.
: Grease 99000–25010 (SUZUKI SUPER
GREASE A or equivalent)
NOTE
Face the “UP” mark “A” on the intake pipe
to upper.
The intake pipe can be identified by the
marks, “F” and “R”.
Thermostat
Install the thermostat assembly (1) and water hoses (2).
Refer to “Water Hose Routing Diagram in Section 1F
(Page 1F-3)”.
Radiator Hose / Breather Hose
Install the radiator hose (1), oil cooler hoses (2) and
breather hose (3).
Refer to “Water Hose Routing Diagram in Section 1F
(Page 1F-3)” and “Throttle Body Construction (Page 1D-
8)”.
Valve Clearance Inspection and Adjustment
B944H11406008
Refer to “Valve Clearance Inspection and Adjustment in
Section 0B (Page 0B-4)”.
“F”: Front cylinder head intake pipe
“R”: Rear cylinder head intake pipe
“A”
“A”
UP F
UP F
UP R
UP R
I944H1140211-05
I944H1140212-01
1
2
2
I944H1140135-01
1
2
2
3
I944H1140134-01

Table of Contents

Related product manuals