EasyManua.ls Logo

Suzuki SFV650 - Page 134

Suzuki SFV650
573 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
1A-71 Engine General Information and Diagnosis:
3 1) Install the throttle body assembly. Refer to “Throttle Body
Removal and Installation in Section 1D (Page 1D-10)”.
2) Connect the STVA lead wire coupler and ECM coupler.
3) Start the engine to check the STV operation.
(STVA operating order: Open Approx. 38% open)
Is the operation OK?
Replace the ECM with a
new one. Refer to “ECM
Removal and
Installation in Section
1C (Page 1C-1)”.
Replace the throttle
body assembly with a
new one. Refer to
“Throttle Body Removal
and Installation in
Section 1D (Page 1D-
10)”.
Step Action Yes No
I705H1110063-01

Table of Contents

Related product manuals