EasyManua.ls Logo

Suzuki SFV650 - Page 343

Suzuki SFV650
573 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Starting System: 1I-5
Assembly
Reassemble the starter motor in the reverse order of
removal. Pay attention to the following points:
CAUTION
!
Replace the O-ring and square-ring with new
ones to prevent oil leakage and moisture.
Tighten the brush holder mounting nut (1) to the
specified torque.
Tightening torque
Starter motor brush holder mounting nut (a): 7
N·m (0.7 kgf-m, 5.0 lbf-ft)
Apply grease to the lip of the dust seal and bearing.
: Grease 99000–25010 (SUZUKI SUPER
GREASE A or equivalent)
Fit the washer (2) to the housing end correctly as
shown in the figure.
Apply a small quantity of moly paste to the armature
shaft.
: Moly paste 99000–25140 (SUZUKI MOLY
PASTE or equivalent)
Align the match mark on the starter motor case with
the match mark on the housing end.
NOTE
The groove side “A” of starter motor case the
housing end.
Tighten the starter motor housing bolts (3) to the
specified torque.
Tightening torque
Starter motor housing bolt (b): 3.5 N·m (0.35 kgf-
m, 2.5 lbf-ft)
(a)
1
I944H1190008-01
I944H1190009-01
2
I944H1190010-02
I944H1190011-01
“A”
I944H1190012-01
(b)
3
I944H1190013-02

Table of Contents

Related product manuals