Charging System: 1J-5
2) Remove the engine sprocket cover (1). Refer to
“Engine Sprocket Removal and Installation in
Section 3A (Page 3A-2)”.
3) Remove the clutch release arm (2), spring (3) and
washer (4).
4) Remove the right frame cover. Refer to “Exterior
Parts Removal and Installation in Section 9D
(Page 9D-4)”.
5) Disconnect the clamp (5), CKP sensor coupler (6)
and generator coupler (7).
6) Remove the speed sensor (8) and generator cover
(9).
7) Remove the gasket (10) and dowel pins (11).
8) Hold the generator rotor with the special tool and
remove the generator rotor bolt.
Special tool
(A): 09930–44530 (Rotor holder)
1
I944H11A0004-01
2
3
4
I944H11A0005-02
6
7
5
I944H11A0006-03
8
9
I944H11A0007-02
10
11
11
I944H11A0008-02
(A)
I944H11A0009-01