2. Transportation, Storage and Installation
2-10
TI 33J01J10-01EN
2.5 Installation
Before installation, be sure that anchor bolts, pedestals, and cable holes are provided
accordingtothecustomer’ssystemcongurationplans.Checkthatthepositionsof
holesontheoorttheanchorboltholesinthechannelbaseofeachpieceofequipment.
2.5.1 Installation on Floor
Check the position of front and back panels of the cabinet.
n Concrete Floor
3,200 N•cm tightening torque.
Equipment
Figure Using Anchor Bolts
Apr. 21, 2017-00