EasyManua.ls Logo

adept technology MV - Introduction; Tests During System Power-Up; Completion of Power-Up Tests; Processor Self-Test

adept technology MV
404 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Appendix F Introduction
376 Adept MV Controller Users Guide, Rev. B
Introduction
Diagnostic self tests are performed when power to the Adept controller is applied
and then continuously through the operating cycle of the V
+
code. These tests
check numerous areas within the controller to ensure that it is operating properly.
Tests During System Power-up
Processor Self-Test
After power is turned on, each CPU performs basic functional checks including
CPU register and mathematical tests, EPROM content checksum test, 100% RAM
read-write test, and a watchdog timer test. If any of the CPU tests fail, a message
is displayed. If the tests pass, no message is displayed and the V
+
operating
system will be loaded onto each CPU. During loading a checksum test is
performed on each record.
System Initialization Tests
If the operating system is loaded successfully, the V
+
copyright message is
displayed. V
+
tests NVRAM checksums and verifies that software licenses are
consistent with installed hardware.
V
+
then checks presence of a vision board and makes read/write test of the vision
framestore.
RSC Self-Test
Adept robots include a Robot Signature Card (RSC) inside the robot. On
power-up, the RSC performs CPU EEPROM checksum, code checksum, and
RAM tests. V
+
tests communication with the RSC, then reads the results of the
RSC Diagnostics.
Completion of Power-up Tests
If any of the initialization tests fail, one or more messages are displayed.
Otherwise, the system ID message is displayed (controller serial number, V
+
version, etc.).
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com

Table of Contents

Other manuals for adept technology MV