Chapter 3 Installing a Robot Controller in a Rack or Panel
70 Adept MV Controller User’s Guide, Rev. B
Rack Mounting
To rack mount the Adept MV-5 or MV-10 robot controller in a standard 19-inch
equipment rack, you must first install the mounting brackets (see Figure 3-9),
then build an extender panel and attach it to the bracket on one side of the
controller.
The controller can be joined to an Adept PA-4 power chassis and mounted in a
rack. Refer to the robot instruction handbook that comes with the robot for
information.
Panel Mounting
To panel mount the Adept MV-5 or MV-10 robot controller, install one bracket on
each side near the back of the controller. Use the screws and washers from the
accessories kit; see Figure 3-9.