EasyManua.ls Logo

Amadas 9960 - Activating Header Height Resume

Default Icon
295 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
9960 Self-Propelled Peanut Combine Operator’s Station
MAN091 06/03/05 41
Activating Header Height Resume
1. Make sure a properly equipped header is
connected to the combine.
2. Run the engine.
3. Set the road transport disconnect switch to
the field position (top photo). The indicator
life must be off.
4. Press the Header Height Resume button
on the ACH display on the corner post
(middle photo).
5. Set the Header Engage Switch to “ON”
(top photo).
Header engage
switch
Header
height
resume
Road transport
disconnect switch

Table of Contents